At-risk turtles vs. turbines: Wind-power project before Ontario’s top court

blandings_turtleColin Perkel,The Canadian Press
TORONTO – An expert tribunal was entitled to conclude a proposed wind farm would devastate a population of already threatened turtles, Ontario’s top court heard Monday. The case, which pits turtles against turbines, could have widespread repercussions as to how endangered species are protected across Canada, and raises questions about the protection of unspoiled areas.

At issue is a proposed nine-turbine wind farm at Ostrander Point south of Belleville on the shore of Lake Ontario. Prince Edward County Field Naturalists Club had successfully argued before the province’s environmental review tribunal that the project on the 324-hectare site would threaten Blanding’s turtles in the area.

Gilead Power, through its Ostrander Point Wind Energy, had Divisional Court overturn that decision in February. It argued the tribunal had made a half-dozen errors in concluding the project would cause “serious and irreversible” harm to the turtles. Addressing the panel in the packed courtroom, lawyer Eric Gillespie, who speaks for the naturalists, pleaded with the three justices to defer to the review tribunal. Read article

Leave a Reply

Your email address will not be published. Required fields are marked *